Fieldglass Scenario-Based Questions 2025

This article concerns real-time and knowledgeable Fieldglass Scenario-Based Questions 2025. It is drafted with the interview theme in mind to provide maximum support for your interview. Go through these Fieldglass Scenario-Based Questions 2025 to the end, as all scenarios have their importance and learning potential.

To check out other Scenarios Based Questions:- Click Here.

Question 1: How would you handle a situation where a vendor claims their invoice is delayed because of a Fieldglass system error, but your internal checks show no issue?

  • Start by calmly validating the vendor’s concern without dismissing it.
  • Check the Fieldglass invoice audit trail for submission and approval timestamps.
  • Compare these with ERP integration logs to ensure data transfer occurred as expected.
  • If no error is found, share evidence with the vendor in a transparent way.
  • Offer to re-trigger the invoice file if needed to keep the payment process smooth.
  • This builds trust while protecting the company from unnecessary payment delays.

Question 2: What would you do if a project manager requests urgent access for a new contingent worker, but the vendor’s Fieldglass profile is incomplete?

  • Explain to the project manager why compliance and profile completeness are critical.
  • Contact the vendor and provide a checklist of missing mandatory fields.
  • Offer support or guidance to speed up the completion process.
  • Keep the project manager updated with realistic timelines.
  • Avoid bypassing required onboarding checks to reduce audit risks.
  • This ensures speed without compromising compliance standards.

Question 3: How would you respond if a critical milestone is delayed because Fieldglass failed to trigger an approval workflow?

  • Identify if the workflow failure is due to missing configuration or a process gap.
  • Temporarily escalate the approval manually to avoid further delays.
  • Document the incident for post-analysis with the technical team.
  • Communicate to all impacted stakeholders with a revised timeline.
  • Suggest preventive measures like workflow health checks.
  • This keeps operations moving while addressing the root cause.

Question 4: How do you handle cases where different departments argue over rate card discrepancies in Fieldglass?

  • Review the rate card data in Fieldglass against signed contracts.
  • Check for any recent updates that may not have synced correctly.
  • Facilitate a joint review session with both departments to align data.
  • If a genuine mismatch exists, escalate for rate card correction.
  • Propose implementing an approval gate before rate changes go live.
  • This approach reduces future disputes and keeps billing accurate.

Question 5: What steps would you take if a vendor consistently misses timesheet submission deadlines in Fieldglass?

  • Analyze the vendor’s historical compliance data in Fieldglass reports.
  • Share the impact of delays on project billing and payments.
  • Offer vendor training sessions to improve system usage.
  • Introduce reminders and escalation triggers for repeated delays.
  • If non-compliance continues, involve procurement for contract review.
  • This approach blends accountability with support.

Question 6: How do you manage urgent changes in project scope that require immediate Fieldglass updates without breaking process compliance?

  • Quickly gather change details from the project team.
  • Log the change request formally in Fieldglass with required justifications.
  • Ensure compliance approval is sought even if processing is expedited.
  • Update vendor assignments or rates accordingly.
  • Keep a record of the urgent change for audit purposes.
  • This balances urgency with governance.

Question 7: How would you troubleshoot if multiple workers report that their Fieldglass logins stopped working mid-contract?

  • Verify if there’s a system-wide outage or a vendor-specific issue.
  • Check user account status in Fieldglass for deactivation flags.
  • If it’s an integration sync error, coordinate with IT support for a fix.
  • Provide temporary access solutions if possible.
  • Update affected workers and vendors with clear timelines.
  • This prevents panic and keeps operations stable.

Question 8: What would you do if a business leader demands faster contingent worker onboarding in Fieldglass, citing delays from current processes?

  • Assess the actual time taken for each onboarding step using Fieldglass reports.
  • Identify bottlenecks such as vendor document submission delays.
  • Suggest automation opportunities like pre-approved templates.
  • Maintain compliance requirements even if timelines are shortened.
  • Pilot the faster process with one department before scaling.
  • This ensures efficiency without risking quality.

Question 9: How do you handle situations where Fieldglass analytics show higher-than-budgeted contractor costs mid-project?

  • Break down costs by vendor, role, and department in Fieldglass.
  • Verify if any rate changes or unapproved overtime are driving costs.
  • Alert the project manager and finance team immediately.
  • Negotiate adjustments or cost controls with vendors if needed.
  • Suggest regular cost monitoring checkpoints.
  • This helps control overruns before they escalate.

Question 10: If a legal audit is announced and you must extract all worker compliance data from Fieldglass within 48 hours, how would you proceed?

  • Identify the exact compliance parameters requested by legal.
  • Use Fieldglass reporting tools to filter and export the required data.
  • Validate the report accuracy before sharing.
  • Escalate any incomplete or missing records immediately.
  • Keep an audit log of all steps taken.
  • This ensures speed, accuracy, and legal readiness.

Question 11: How do you react if Fieldglass integration with your HR system starts duplicating worker records?

  • Pause the sync temporarily to stop further duplication.
  • Identify whether the issue is mapping-related or due to vendor data errors.
  • Work with the integration team to clean up duplicates.
  • Communicate the incident to HR and procurement.
  • Monitor closely after fix deployment.
  • This minimizes data chaos and keeps trust intact.

Question 12: How do you deal with vendors bypassing Fieldglass to send invoices directly to your finance department?

  • Remind vendors of contractual obligations to use Fieldglass for invoicing.
  • Highlight the risks of bypassing approval workflows.
  • Report repeat offenders to procurement for action.
  • Provide vendor refresher training on Fieldglass processes.
  • Monitor compliance through monthly reports.
  • This safeguards process integrity.

Question 13: What’s your approach if Fieldglass reporting shows 0% utilization for a key vendor for two consecutive months?

  • Validate the data to ensure no reporting errors.
  • Contact the vendor to understand if assignments have ended early.
  • Inform project owners about the underutilization trend.
  • Discuss possible reallocation of vendor resources.
  • Adjust vendor agreements if utilization remains low.
  • This optimizes resource usage.

Question 14: How would you respond if a hiring manager requests a non-approved job role to be created in Fieldglass for urgent hiring?

  • Confirm if the role exists in the approved job catalog.
  • Explain the compliance and budget risks of bypassing approvals.
  • Offer alternative approved roles that can meet requirements.
  • If truly needed, escalate for expedited governance review.
  • Document all approvals and decisions.
  • This avoids unauthorized role creation.

Question 15: How do you handle if vendors complain about slow Fieldglass system performance during peak times?

  • Collect specifics about the time and type of transactions affected.
  • Check system health status from SAP Fieldglass service updates.
  • Communicate to vendors about known issues and expected resolutions.
  • Suggest off-peak processing for large bulk actions.
  • Escalate repeated performance issues to SAP support.
  • This keeps vendors informed and engaged.

Question 16: What would you do if a department head bypasses Fieldglass to directly hire contingent staff?

  • Politely explain the compliance risks and audit exposure.
  • Gather details of the hire and enter it retrospectively in Fieldglass.
  • Educate the department on why Fieldglass governance matters.
  • Monitor for repeated non-compliance.
  • Involve leadership if the pattern continues.
  • This enforces policy without damaging relationships.

Question 17: How do you manage when multiple vendors submit duplicate candidates for the same role in Fieldglass?

  • Identify duplicates through candidate matching features.
  • Inform vendors about the duplication and contract rules.
  • Allow only the first compliant submission per policy.
  • Keep hiring managers informed to avoid bias.
  • Suggest vendors improve pre-submission checks.
  • This ensures fairness and avoids confusion.

Question 18: How do you proceed if Fieldglass error logs show repeated API failures in ERP integration?

  • Verify if failures are due to data mismatches or connection issues.
  • Escalate to the integration team with detailed error logs.
  • Process critical transactions manually as a fallback.
  • Monitor once fixes are applied.
  • Document all incidents for post-mortem review.
  • This ensures continuity during technical issues.

Question 19: How would you handle a scenario where Fieldglass contract end dates don’t match the actual worker departure dates?

  • Review contract data against exit clearance records.
  • Correct discrepancies in Fieldglass to avoid payment errors.
  • Inform vendors to update future departure dates promptly.
  • Suggest an automated reminder before contract expiry.
  • Share lessons learned with HR and procurement.
  • This keeps data accurate and payments clean.

Question 20: How do you respond when procurement asks for a vendor performance review but Fieldglass has limited historical data?

  • Gather whatever historical data is available in Fieldglass.
  • Supplement with manual performance tracking from project teams.
  • Interview key stakeholders for qualitative feedback.
  • Create a blended scorecard combining both sources.
  • Recommend better tracking fields for future use.
  • This makes the review meaningful despite data gaps.

Question 21: How would you act if Fieldglass shows workers as active, but payroll data indicates they have already left the company?

  • First, verify the discrepancy by checking actual termination dates in HR records.
  • Update worker statuses in Fieldglass to prevent future payments.
  • Investigate why the termination workflow didn’t update the system.
  • Coordinate with integration teams to prevent recurrence.
  • Communicate to payroll and procurement teams about the fix.
  • This keeps financial accuracy and prevents compliance issues.

Question 22: What’s your approach if a critical vendor refuses to use Fieldglass citing “too complex to operate”?

  • Understand their exact pain points through a short feedback session.
  • Offer targeted training focusing only on the features they need.
  • Highlight the contractual requirement and compliance importance.
  • Assign a support contact for their first few transactions.
  • Track their usage and provide positive reinforcement.
  • This turns resistance into cooperation.

Question 23: How would you proceed if Fieldglass timesheet data and ERP payment data never match?

  • Compare both systems’ data for key fields like hours and rates.
  • Identify whether mismatches happen in submission, approval, or integration stages.
  • Escalate mapping errors to the integration team.
  • Correct affected records to clear pending payments.
  • Suggest a reconciliation process before each payroll cycle.
  • This prevents ongoing financial mismatches.

Question 24: How do you handle a situation where the project team claims Fieldglass reports are “too slow” to support urgent decisions?

  • Review the report filters and complexity causing delays.
  • Suggest breaking large reports into smaller, focused ones.
  • Explore scheduled report delivery to decision-makers.
  • Work with SAP support if performance is system-related.
  • Encourage use of dashboards for real-time insights.
  • This speeds up decision-making without compromising data quality.

Question 25: How do you address compliance risk when a vendor uploads incomplete background check documents in Fieldglass?

  • Reject the incomplete documents with clear feedback.
  • Remind the vendor of contractual compliance obligations.
  • Offer guidance on acceptable document formats and details.
  • Notify the hiring manager about the compliance hold.
  • Track and escalate if delays persist.
  • This ensures legal and audit readiness.

Question 26: How would you act if two different vendors claim they “own” the same candidate profile in Fieldglass?

  • Check submission timestamps and source details.
  • Follow the company’s first-submission or client-preference policy.
  • Communicate the decision clearly to both vendors.
  • Advise vendors to confirm candidate exclusivity before submission.
  • Monitor for repeated conflicts from the same vendors.
  • This keeps vendor relationships fair and transparent.

Question 27: What’s your approach when a business leader questions why Fieldglass is necessary at all for contingent workforce?

  • Explain Fieldglass’ role in compliance, cost control, and visibility.
  • Share examples of risks avoided through its workflows.
  • Highlight audit readiness and vendor accountability benefits.
  • Show cost savings from rate card enforcement.
  • Emphasize how it centralizes vendor management.
  • This shifts perception from “extra work” to “strategic value.”

Question 28: How do you handle Fieldglass data that shows unusually high overtime for certain workers?

  • Validate overtime approvals and related project demands.
  • Check if overtime aligns with budget and policy.
  • Alert project managers to investigate possible overwork.
  • Flag any unapproved overtime to procurement.
  • Suggest better resource allocation to reduce overtime need.
  • This keeps labor costs and compliance in check.

Question 29: How do you react if Fieldglass worker onboarding gets stuck due to pending manager approvals while project deadlines loom?

  • Contact the manager to understand the delay reason.
  • Escalate to leadership if it’s blocking critical delivery.
  • Offer to walk the manager through quick approval steps.
  • Track approval turnaround times for process improvement.
  • Communicate the new expected start date to vendors.
  • This keeps deadlines realistic and transparent.

Question 30: How would you act if you find Fieldglass job postings attracting irrelevant vendor submissions repeatedly?

  • Review and refine job descriptions to be more specific.
  • Share examples of desired profiles with vendors.
  • Introduce vendor performance tracking on submission quality.
  • Consider vendor pre-screening before posting.
  • Train hiring managers to create more targeted requisitions.
  • This improves candidate fit over time.

Question 31: What would you do if a vendor disputes a Fieldglass-generated late submission penalty?

  • Review the actual submission timestamps and policy terms.
  • Share the system audit logs with the vendor for transparency.
  • If there’s a genuine technical fault, consider waiving the penalty.
  • Reinforce the importance of timely submissions.
  • Document the dispute and resolution for audit.
  • This maintains fairness while enforcing discipline.

Question 32: How do you handle a department wanting to manage contingent workers outside Fieldglass for “flexibility”?

  • Explain the compliance and cost risks of bypassing the system.
  • Share real examples of past issues avoided using Fieldglass.
  • Offer to set up a customized workflow for their needs.
  • Gain leadership backing to enforce the policy.
  • Monitor adherence after onboarding them to the system.
  • This balances flexibility with governance.

Question 33: How do you manage if Fieldglass vendor scorecards show poor performance but the business still wants to extend their contract?

  • Share the scorecard results with business leaders openly.
  • Highlight risks and previous delivery issues.
  • Suggest improvement plans before extension.
  • If still extended, monitor closely with monthly reviews.
  • Document leadership’s decision for accountability.
  • This keeps responsibility clear.

Question 34: What’s your approach when multiple project teams request urgent vendor onboarding at the same time?

  • Prioritize based on project criticality and deadlines.
  • Allocate resources to process onboarding in parallel where possible.
  • Communicate realistic timelines to each team.
  • Avoid rushing at the cost of compliance checks.
  • Suggest a staggered onboarding schedule in the future.
  • This manages expectations and reduces risk.

Question 35: How would you act if you discover Fieldglass is not capturing certain mandatory worker compliance data?

  • Identify which data points are missing and why.
  • Escalate to the configuration team to add required fields.
  • Collect missing data manually for current workers.
  • Inform vendors and managers about the update.
  • Monitor future compliance uploads for completeness.
  • This closes gaps quickly and avoids legal risk.

Question 36: How do you respond if Fieldglass analytics contradict finance reports on vendor spend?

  • Check the data filters and timeframes used in both systems.
  • Identify if currency conversion or tax handling differences exist.
  • Arrange a joint data review with finance.
  • Adjust reporting logic for alignment going forward.
  • Document the reconciliation process.
  • This prevents confusion in future budgeting.

Question 37: How would you handle an escalation where a vendor accuses Fieldglass of unfair candidate rejection rates?

  • Review rejection reasons to ensure they align with policy.
  • Share anonymized feedback with the vendor for improvement.
  • Encourage better candidate pre-screening.
  • Track if rejection rates improve over time.
  • Address any hiring manager bias if found.
  • This balances fairness with quality control.

Question 38: What would you do if a manager consistently delays timesheet approvals in Fieldglass, causing vendor payment delays?

  • Share the impact of delayed approvals with the manager.
  • Offer to set automated reminders for timesheet approval.
  • Escalate persistent delays to department heads.
  • Suggest assigning a backup approver during absences.
  • Track improvement over time.
  • This keeps payments timely.

Question 39: How do you proceed if a vendor insists Fieldglass reports are inaccurate compared to their internal system?

  • Request specific examples from the vendor.
  • Compare Fieldglass data to their provided records.
  • Identify if discrepancies are due to timing or methodology.
  • Adjust report parameters if necessary.
  • Share updated results to build trust.
  • This strengthens vendor relations.

Question 40: How do you act if Fieldglass auto-rejections remove qualified candidates during bulk imports?

  • Review the rejection criteria in place.
  • Identify if the filters are too strict or misaligned.
  • Temporarily adjust criteria for critical roles.
  • Communicate changes to vendors.
  • Suggest a quality check before imports.
  • This prevents losing good talent.

Question 41: How would you manage if Fieldglass integration downtime is announced during a high-volume vendor invoicing period?

  • Inform all vendors and internal teams immediately about the downtime.
  • Provide alternate manual submission instructions for urgent cases.
  • Coordinate with finance to prevent missed payment runs.
  • Track all manual invoices for later upload to Fieldglass.
  • Verify no duplicate payments occur post-recovery.
  • This ensures business continuity during outages.

Question 42: What’s your approach when a vendor uploads incorrect tax codes in Fieldglass invoices repeatedly?

  • Identify if errors are due to misunderstanding or system setup.
  • Share tax code guidelines and examples with the vendor.
  • Offer a quick refresher training if needed.
  • Reject incorrect invoices promptly to avoid finance errors.
  • Escalate to procurement if the issue persists.
  • This keeps financial compliance intact.

Question 43: How would you act if Fieldglass reports show that one vendor gets the majority of assignments, causing other vendors to complain?

  • Analyze allocation trends over the past few months.
  • Check if the preferred vendor’s performance justifies the volume.
  • Share transparent allocation data with stakeholders.
  • Encourage other vendors to improve quality to stay competitive.
  • Review vendor selection rules for fairness.
  • This promotes balanced vendor relationships.

Question 44: How do you handle if Fieldglass alerts show expiring worker contracts but managers haven’t raised extensions yet?

  • Send reminders to managers about upcoming expiries.
  • Flag critical roles for urgent extension approval.
  • Escalate if deadlines are close and no action is taken.
  • Document all follow-ups for audit records.
  • Suggest automated extension prompts in the future.
  • This prevents sudden workforce gaps.

Question 45: How would you respond if a vendor claims they didn’t receive Fieldglass notifications for a new assignment?

  • Check notification logs in Fieldglass for delivery status.
  • Confirm the vendor’s contact details are up to date.
  • Resend the notification manually if needed.
  • Educate the vendor on checking their Fieldglass dashboard regularly.
  • Monitor for repeated communication issues.
  • This avoids missed assignments.

Question 46: How do you proceed if Fieldglass data shows a sudden drop in vendor candidate submission rates?

  • Verify if there are fewer job postings during that period.
  • Contact vendors to understand if there are sourcing challenges.
  • Review market trends for talent availability.
  • Offer feedback on job descriptions to improve attraction.
  • Track if submission rates recover after changes.
  • This addresses supply chain issues early.

Question 47: What’s your approach if the business demands cost savings but Fieldglass shows rates already at market average?

  • Share benchmarking reports with stakeholders to set expectations.
  • Explore other cost areas like overtime, travel, or early terminations.
  • Negotiate volume-based discounts with vendors.
  • Suggest skill mix adjustments to reduce high-rate roles.
  • Review long-term contracts for renegotiation opportunities.
  • This finds savings without damaging quality.

Question 48: How do you react if a vendor submits candidate profiles without required certifications in Fieldglass?

  • Reject the submission with a clear explanation.
  • Remind the vendor of mandatory certification policies.
  • Suggest pre-verification before submission.
  • Monitor if the vendor improves in future submissions.
  • Escalate to procurement for repeated non-compliance.
  • This ensures skill quality and compliance.

Question 49: How would you act if Fieldglass timesheet approval delays are caused by managers on long leave?

  • Identify an alternate approver from the department.
  • Set up delegation in Fieldglass for future absences.
  • Process urgent timesheets manually if required.
  • Notify vendors about adjusted timelines.
  • Review approval coverage policies with HR.
  • This keeps payment cycles smooth.

Question 50: How do you handle if a vendor claims Fieldglass billing calculations are inaccurate?

  • Request specific invoice examples from the vendor.
  • Recalculate using Fieldglass audit data.
  • Check if rate card or tax settings are correct.
  • Share findings with the vendor to close the loop.
  • Raise a support ticket if system logic is at fault.
  • This maintains billing accuracy and trust.

Question 51: How would you proceed if Fieldglass worker data doesn’t match compliance audit records?

  • Identify mismatched data points like IDs or contract dates.
  • Correct Fieldglass records immediately.
  • Investigate why the mismatch occurred.
  • Communicate the fix to audit teams.
  • Put in place data validation steps before audits.
  • This keeps records audit-ready.

Question 52: How do you respond if Fieldglass dashboards are not giving real-time updates during critical decision-making?

  • Confirm if it’s a data refresh schedule issue.
  • Use direct report exports for immediate decisions.
  • Contact SAP support if system lag is abnormal.
  • Inform decision-makers of refresh intervals.
  • Suggest process changes for time-sensitive cases.
  • This ensures informed decisions even with delays.

Question 53: How would you handle if the procurement team wants to onboard a vendor without proper Fieldglass vetting?

  • Explain the compliance and risk implications.
  • Request at least minimal vetting before onboarding.
  • Document procurement’s decision for accountability.
  • Offer to fast-track the vetting process.
  • Keep leadership informed of potential risks.
  • This protects against future issues.

Question 54: How do you act if Fieldglass worker extensions are being approved after expiry dates?

  • Highlight the legal and operational risks of retroactive approvals.
  • Send expiry alerts earlier to managers.
  • Escalate chronic delays to leadership.
  • Suggest a cut-off policy for late extensions.
  • Monitor if timely approvals improve.
  • This prevents compliance breaches.

Question 55: What would you do if Fieldglass vendor scorecards are consistently missing key performance metrics?

  • Review current scorecard setup with procurement.
  • Add missing metrics aligned to business priorities.
  • Ensure vendors understand the updated criteria.
  • Pilot the new scorecard with one vendor.
  • Roll out after feedback and adjustments.
  • This makes scorecards more meaningful.

Question 56: How do you handle if vendors complain about excessive Fieldglass notifications?

  • Review notification settings for necessity and frequency.
  • Reduce non-critical alerts while keeping key updates.
  • Group certain notifications into weekly summaries.
  • Train vendors on notification management.
  • Monitor satisfaction after adjustments.
  • This improves vendor experience.

Question 57: How would you act if Fieldglass contract terms don’t align with master vendor agreements?

  • Compare contract data in Fieldglass with legal agreements.
  • Correct discrepancies immediately.
  • Inform procurement and legal teams.
  • Implement a double-check before contract upload.
  • Keep a record of changes made.
  • This ensures contractual accuracy.

Question 58: How do you react if business leaders request custom reports in Fieldglass that don’t currently exist?

  • Understand the exact data they need and why.
  • Check if existing reports can be adapted.
  • Build the custom report if technically feasible.
  • Provide timelines and interim data sources.
  • Train leaders on using the new report.
  • This supports informed decision-making.

Question 59: How would you manage if Fieldglass rate card updates were missed during a contract renewal?

  • Immediately update rate cards to reflect the renewal terms.
  • Check for any invoices processed with old rates.
  • Correct affected transactions with vendors.
  • Implement a checklist for renewals.
  • Communicate changes to all stakeholders.
  • This avoids financial and audit issues.

Question 60: What’s your approach if a critical vendor’s Fieldglass performance drops suddenly mid-contract?

  • Review performance data and identify the dip period.
  • Discuss issues directly with vendor management.
  • Offer support or corrective action plans.
  • Monitor closely for improvement.
  • Prepare a contingency vendor if issues persist.
  • This protects project delivery timelines.